Josef replaced by Nick after only three weeks

a ental boiler replacement

It sounds like a football commentary – but it isn’t. It’s about a rental boiler replacement in record time!
A brief recap:


When our customer wanted to commission his brand-new paper mill in the Lower Rhine region, it became apparent that the planned process steam supply – which, incidentally, was not supplied by us – would not be ready in time.


Our (S)Teamplayers from the rental boiler department developed a suitable solution:
Josef (8 t/h, 5.9 MW, 20 bar) stepped in as an interim solution and took over the supply of process steam for three weeks, thus ensuring the planned start of production.
As soon as Nick (12 t/h, 8.4 MW, 16 bar) was returned from rental and checked, the rental equipment was to be replaced.

And that is exactly what happened last week.