Specially designed GH container system

delivered to Poland

Even though it is already the fifth of May, we do not want to deprive you of our ‘Project of the Month April 2025’! The project managers of one of the most modern food processors visited Hagelschuer at the end of March to approve their new GH container system in special design. It is intended for the new location in the greater Warsaw area. The mobile steam boiler system in container design is not only optimally adapted to the high technical requirements on site, it also meets all the emission limits required by 44. BImSchV §12,14 (DE). In addition, its special colour scheme fits seamlessly and harmoniously into the existing colour concept for the new location.

The company is strongly committed to ecology and sustainable development. The project managers attach particular importance to the use of energy- and water-saving systems.