{"id":10155,"date":"2021-08-16T13:15:52","date_gmt":"2021-08-16T11:15:52","guid":{"rendered":"https:\/\/www.dampfkessel.com\/?page_id=10155"},"modified":"2021-10-27T10:59:54","modified_gmt":"2021-10-27T08:59:54","slug":"pipeline-construction","status":"publish","type":"page","link":"https:\/\/www.dampfkessel.com\/en\/buy\/pipeline-construction\/","title":{"rendered":"Pipeline construction"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Startseite<\/a><\/span><\/span><\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\tPIPELINE\nCONSTRUCTION\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Pipeline construction for system sizes of up to 50 t\/h steam output and 35 MW heat output.<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

PIPELINE CONSTRUCTION FOR FIXED STEAM GENERATORS<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

For fixed system sizes from 0.5 to 50 tonnes steam output<\/strong>\u00a0or\u00a0up to 35 MW<\/strong>\u00a0heat output<\/strong>, as well as all of the peripheral devices, we are your competent partner in pipeline construction matters. The assembly work includes all media and all pipelines inside and outside the power plant that is ready for operation. Optional stainless steel pipes<\/strong>\u00a0or pipes made of black steel<\/strong>\u00a0are installed for\u00a0gas and steam lines<\/strong>.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Your point of contact<\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

D\u00fclmen & Bickenbach sites<\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Daniel\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Daniel Scholbrock<\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t

Pipeline construction<\/p>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t