{"id":19550,"date":"2022-08-16T13:04:49","date_gmt":"2022-08-16T11:04:49","guid":{"rendered":"https:\/\/www.dampfkessel.com\/?p=19550"},"modified":"2022-08-16T13:05:30","modified_gmt":"2022-08-16T11:05:30","slug":"heavy-transport-of-two-hot-water-boilers","status":"publish","type":"post","link":"https:\/\/www.dampfkessel.com\/en\/heavy-transport-of-two-hot-water-boilers\/","title":{"rendered":"Heavy transport of two hot water boilers"},"content":{"rendered":"\t\t
Today at noon, two hot water boilers<\/strong> (13 bar, 24.99 MW) were loaded at our plant<\/strong> for a power plant company near Hanover<\/strong>. With the help of our lifting load bridge<\/strong>, the two 40-ton boilers<\/strong> were lifted smoothly and precisely onto almost 30-meter-long drop deck loaders<\/strong>. A third truck was needed to load the steel scaffolding<\/strong>, stairs<\/strong>, platforms<\/strong> and plant equipment<\/strong>. After everything was safely prepared for transport, the hot water boilers left for Hanover in the evening hours. After on-site installation, our qualified fitters<\/strong> will also take care of the piping construction<\/strong>. At Hagelschuer, all boiler plants are basically completely<\/strong> assembled in the assembly halls. The equipment is then suitably disassembled<\/strong> for transport. In this way, we keep assembly times<\/strong> as short as possible during installation.<\/p>