{"id":20822,"date":"2022-10-12T12:14:11","date_gmt":"2022-10-12T10:14:11","guid":{"rendered":"https:\/\/www.dampfkessel.com\/?p=20822"},"modified":"2022-10-19T12:22:53","modified_gmt":"2022-10-19T10:22:53","slug":"steam-distributor-with-safety-valve","status":"publish","type":"post","link":"https:\/\/www.dampfkessel.com\/en\/steam-distributor-with-safety-valve\/","title":{"rendered":"Steam distributor with safety valve"},"content":{"rendered":"\t\t
In our series “Components, of a steam boiler plant and their function”<\/strong> we have already introduced you to the most diverse components. Today we will go into the operation of a steam distributor<\/strong>. This individual design with the associated steam boiler plant is currently under construction at our company. The basic task of<\/strong> a steam distributor<\/strong> is to distribute the steam coming from the boiler to the various consumers\/consumers.<\/strong> Our tundish is supplied with process steam from no less than two steam boilers<\/strong>. The steam is fed in at a pressure of 13 bar<\/strong> via two DN 200 supply lines<\/strong>. The built-in safety valve<\/strong> ensures that the permissible operating pressure<\/strong> is not exceeded. The condensate<\/strong> produced is drained into the condensate line<\/strong> at the bottom of the distributor with the aid of a bimetallic<\/strong> steam trap<\/strong>. From there, it is returned to the feedwater tank<\/strong>. According to the customer’s specifications, the steam distributor in the first expansion stage<\/strong> will be equipped with a max. Operating pressure of 13 bar fed<\/strong>. After the reconstruction of the production in 1-2 years, the max. However, the operating pressure can be increased to 18 bar<\/strong>. Directly during the planning and design<\/strong>, our professionals from the tank construction<\/strong> have designed and calculated<\/strong> accordingly. Due to the high Product of nominal size and perm. Operating pressure (DN350 x 18 bar > 5000) had to be<\/strong> a Individual acceptance incl. Design review<\/strong> be carried out by a Z\u00dcS<\/strong>. Of course, our experts have taken care of the necessary applications and the documentation procedure<\/strong>. Now the steam distributor can be assembled and insulated on site at the customer’s premises before it is put into operation.<\/strong><\/p>