{"id":16972,"date":"2022-03-07T11:51:04","date_gmt":"2022-03-07T10:51:04","guid":{"rendered":"https:\/\/www.dampfkessel.com\/referenzen\/deutsche-see-gmbh\/"},"modified":"2022-08-17T12:57:12","modified_gmt":"2022-08-17T10:57:12","slug":"deutsche-see-gmbh","status":"publish","type":"referenzen","link":"https:\/\/www.dampfkessel.com\/en\/referenzen\/deutsche-see-gmbh\/","title":{"rendered":"Deutsche See GmbH"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Deutsche See GmbH <\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

GH CONTAINER PLANT DELIVERED TO DEUTSCHE SEE<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

MORE PROCESS STEAM FOR EXTENDED PRODUCTION<\/h3>

Deutsche See GmbH is a food manufacturer based in Bremerhaven. As the market leader for fish and seafood, Deutsche See stands for the enjoyment and love of fish and seafood of excellent quality.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t

The task<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Hagelschuer<\/strong> was commissioned to manufacture a new 2 t \/h steam boiler plant<\/strong> at 10 bar<\/strong>. The system was designed as a compact, fully functional mobile unit<\/strong> in a container<\/strong>.<\/p>

There were essentially two reasons that<\/strong> spoke in favor of the renewal<\/strong> and, at the same time, expansion of the existing steam supply<\/strong> . The existing boiler house<\/strong> , in which the old plant was housed, was placed extremely unfavorably<\/strong> in the middle of the smokehouse<\/strong>. In addition, the feed water supply was defective<\/strong> and a necessary replacement was<\/strong> almost impossible<\/strong> due to the structural conditions. In order to be able to further expand the production capacities<\/strong> and to be able to cover the increasing demand<\/strong> for steam supply,<\/strong> the decision was made to use the GH container solution from Hagelschuer<\/strong> .<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Logo\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Image of the GH container facility <\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Referenz\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Referenz\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

The attachment<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The container<\/strong> is 10 m long, 3 m wide and 3.50 m high. It was set up on a stable foundation<\/strong> in front of the production site within a very short time<\/strong> . The necessary connection<\/strong> work for the steam and gas lines<\/strong> was then carried out.<\/p>

Immediately afterwards, the commissioning<\/strong> and the necessary T\u00dcV approval<\/strong> took place without any production downtimes.<\/strong><\/p>

The old system<\/strong> was completely dismantled by Hagelschuer in the weeks that followed.<\/strong><\/p>

The free space<\/strong> could then be used to expand production<\/strong>.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t