{"id":19679,"date":"2021-10-25T07:50:14","date_gmt":"2021-10-25T05:50:14","guid":{"rendered":"https:\/\/www.dampfkessel.com\/referenzen\/schapfenmuehle\/"},"modified":"2022-08-17T07:52:53","modified_gmt":"2022-08-17T05:52:53","slug":"schapfenmuehle","status":"publish","type":"referenzen","link":"https:\/\/www.dampfkessel.com\/en\/referenzen\/schapfenmuehle\/","title":{"rendered":"SchapfenM\u00fchle"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

SchapfenM\u00fchle<\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

GH container plant installed on the roof as an energy center<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The tradition-conscious family business SchapfenM\u00fchle has a high quality awareness
and demanding requirements for the process steam supply.<\/p>

Hagelschuer supplied a containerized steam boiler plant to SchapfenM\u00fchle GmbH & Co. KG<\/a> from Ulm.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t

The task<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The fully equipped energy center was built at the company’s site in Dornstadt on the roof of the
production building and connected to all supply lines.
The GH container plant supplies 2.5 t \/h process steam at 32 bar permissible operating pressure. The division
and arrangement of the plant technology in the container has been deliberately designed generously in order to
sufficient space for operation and maintenance. To the elementals
In this project, one of the most important plant components is the built-in steam accumulator.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Referenz\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Image of the GH container facility <\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

The attachment<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

If short-term and counter-cyclical steam withdrawals are pending that the steam generator cannot provide, the steam accumulator compensates for the required steam quantities and makes them available. The design, execution and commissioning of the container plant and the steam accumulator were individually calculated and optimally implemented by the Hagelschuer specialists.
The fast and solution-oriented implementation of the modern plant technology ensured a satisfied customer.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t