{"id":19712,"date":"2022-07-26T08:41:18","date_gmt":"2022-07-26T06:41:18","guid":{"rendered":"https:\/\/www.dampfkessel.com\/referenzen\/2-t-h-steam-generator-as-product-boiler\/"},"modified":"2022-08-17T08:42:02","modified_gmt":"2022-08-17T06:42:02","slug":"2-t-h-steam-generator-as-product-boiler","status":"publish","type":"referenzen","link":"https:\/\/www.dampfkessel.com\/en\/referenzen\/2-t-h-steam-generator-as-product-boiler\/","title":{"rendered":"2 t\/h steam generator as product boiler"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

2 t\/h steam generator as product boiler <\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Easier installation conditions ensure the desired boiler location in production\n\n<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

One of the largest bakery companies in the world<\/strong>, needed a new steam boiler plant<\/strong> for its production site in the Harz Mountains<\/strong>. In order to existing infrastructure<\/strong> and connection to the consumer<\/strong> further to maintain<\/strong>, the new steam boiler plant had to be reinstalled in the installation room on the 1st floor.<\/strong> Since this according to applicable federal law<\/strong> no<\/strong> longer complied with the regulation for: “Technical Rules for Steam Boiler Installation – Installation of Steam Boiler Plants with Group IV Steam Boilers (TRD 403)”,<\/strong> an approvable solution<\/strong> for the new plant<\/strong> had to be found.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

The task<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

The Hagelschuer experts<\/strong> were able to quickly remedy<\/strong> this situation by taking advantage of the simplified installation conditions for<\/strong> the product boilers<\/strong>. For this purpose the simple basic formula of pressure x water content < 20,000 applied.<\/strong> In this specific case, this meant: the boiler with NW 2.56 m\u00b3 may have a maximum pressure of 7.5 bar so that the 20000 is not exceeded.<\/strong> Here the plant can be equipped with 6.5 bar working pressure<\/strong> on the existing line system<\/strong> are driven and is thus significantly below the max. permissible operating pressure.<\/strong><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Pictures from the project<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t