Pipe
line construction

Piping construction for plant sizes up to 50 t/h steam output and 35 MW heat output.

Piping construction for permanently installed steam generators

Piping
construction for permanently installed steam generators

We are your competent partner when it comes to pipeline construction for permanently installed plant sizes from 0.5 to 50 tons of steam output or up to 35 MW of heat output as well as the entire periphery. The installation work includes all media and all pipelines inside and outside the ready-to-use energy center. For gas and steam pipes, we use either stainless steel or black steel pipes.

Your contact person

Standort Dülmen

Daniel Scholbrock

Leitung Projektabteilung

Engineering

Pipeline construction

for steam and hot water boiler systems

Planning, consulting, implementation - everything from a single source

Our large stock of fittings and connectors, flanges and brackets allow us a high degree of flexibility and fast production times in pipeline construction. Do you need larger nominal diameters and higher temperature or pressure loads? We will be happy to create a pipe statics adapted to your conditions, including the complete expansion and support concept. We are also certified and approved for complex challenges thanks to our HPO / AD 2000 process approval and PED module A1 verification. Benefit from our certified welders and welding experts, our in-house CAD department and our experienced project team.
[popup_anything id="10286"]