Steam boiler TÜV approval & preparation
Legislation requires an internal inspection and a pressure test for steam boilers and pressure vessels every three years. Hagelschuer offers you preparation and all the necessary preparatory work for this from a single source, right through to monitoring the inspection and subsequent recommissioning – efficiently and cost-effectively.
The preparation for the steam boiler TÜV inspection includes:
- Flue gas side and water side opening of the steam boiler
- Filling, preparing for the pressure test and pressurizing the steam boiler
- Accompanying the pressure test, then draining the water
- Preparing and accompanying the internal examination
- Closing the openings on the flue gas and water side and recommissioning
Your contact person
Standort Dülmen
Guido Gehring
Technischer Vertrieb
[popup_anything id="10286"]