Speedfactory

Case Study: Steam for the speedfactory

Hagelschuer supplies Adidas

The world-famous sporting goods manufacturer Adidas is supplied with even more energy by Hagelschuer in its futuristic SPEEDFACTORY sports shoe factory in Ansbach.

Oechsler, a company specializing in plastics processing, operates the SPEEDFACTORY, where sports shoes are produced using innovative processes. The heat required for plastics processing has been supplied by Hagelschuer’s rental container plant “Julia” since 2015. The capacity of Julia with 2 t/h has currently become too low because SPEEDFACTORY has installed additional production lines.

The task

To meet the higher energy demand, Oechsler switched to the rental container “Laura”. With an output of 5 t/h, Laura can produce significantly more heat. Hagelschuer realized the swap in a record-breaking time. However, the new plant not only supplies the shoe factory with more heat energy, but also makes water treatment more economical – energy and water costs have been reduced by around 15%.

Pictures of the rental boiler Laura

About Laura

Laura is a steam boiler plant in GH container equipped with Economiserm, switchgear, chimney system,
feed water tank with deaerator, a softening plant with residual hardness monitoring and
feedwater pumps.

The burner can be operated with natural gas and light fuel oil. The mode of operation is according to EN 12953 72h.

About Oechsler

Founded in 1864 by Matthias Oechsler, who gave the company its name, the company has developed into one of the leading international suppliers of plastics technology in more than 150 years. At its sites in Europe, Asia and America, Oechsler manufactures products that make life easier, safer and more comfortable with around 3,100 highly motivated employees.

More references for steam generators in the laundry and textile industry

Kampschulte

Kampschulte

At the old, historically grown company location of Kampschulte, there was a poor logistical connection. The production processes could not be further optimized due to the building structure

Learn more

TAG Krefeld

TAG Composites & Carpets GmbH Case Study: Three-pass boiler including boiler house Hagelschuer installs complete system incl. boiler house A Hagelschuer steam boiler system was

Learn more
Hagelschuer Referenz Textilpflege Auerbach - Kesselanlage heben

Textilpflege GmbH Auerbach

Textilpflege GmbH Auerbach CASE STUDY: STEAM GENERATORS FOR LAUNDRY AND TEXTILE TECHNOLOGY STEAM PLANT IN THE BOILER HOUSE MADE OF PRE-CAST CONCRETE PARTS Hagelschuer added

Learn more
[popup_anything id="10286"]