TAG Composites & Carpets GmbH
Case Study: Three-pass boiler including boiler house
Hagelschuer installs complete system incl. boiler house
A Hagelschuer steam boiler system was installed at TAG Composites & Carpets GmbH in Krefeld in December 2017. The three-pass boiler has an impressive output of 15.5 t of steam per hour and complies with the European EN 12953 standard.
The task
In addition to the planning and design of the complete steam boiler plant, the special feature of this project was the additional construction of a boiler house in lightweight construction.
Pictures from the plant
About the plant
It was important to the Krefeld-based specialist for the finishing of technical textiles and carpeting to connect directly to the existing building fabric and the existing supply lines. With its dimensions of 12,000 x 6,000 x 7,000 mm, as well as its thermally insulated design, the new lightweight hall meets all the specified criteria. The exhaust gases are discharged via a 13 m high sound-attenuated chimney system.
- Three-pass boiler 15 t / h
- EN 12953 standard
- incl. Lightweight hall
TAG Composites & Carpets GmbH
TAG Composites & Carpets GmbH has seen itself as a reliable partner for its customers for over 100 years. Today, especially when it comes to finishing and functional coating of carpets of various types or yarn dyeing.
More references for steam generators in the laundry and textile industry
Kampschulte
At the old, historically grown company location of Kampschulte, there was a poor logistical connection. The production processes could not be further optimized due to the building structure
Speedfactory-Adidas
Speedfactory Case Study: Steam for the speedfactory Hagelschuer supplies Adidas The world-famous sporting goods manufacturer Adidas is supplied with even more energy by Hagelschuer in
Textilpflege GmbH Auerbach
Textilpflege GmbH Auerbach CASE STUDY: STEAM GENERATORS FOR LAUNDRY AND TEXTILE TECHNOLOGY STEAM PLANT IN THE BOILER HOUSE MADE OF PRE-CAST CONCRETE PARTS Hagelschuer added