Kampschulte

Kampschulte

At the old, historically grown company location of Kampschulte, there was a poor logistical connection. The production processes could not be further optimized due to the building structure

TAG Krefeld

TAG Composites & Carpets GmbH Case Study: Three-pass boiler including boiler house Hagelschuer installs complete system incl. boiler house A Hagelschuer steam boiler system was installed at TAG Composites & Carpets GmbH in Krefeld in December 2017. The three-pass boiler has an impressive output of 15.5 t of steam per hour and complies with the […]

Speedfactory-Adidas

Speedfactory Case Study: Steam for the speedfactory Hagelschuer supplies Adidas The world-famous sporting goods manufacturer Adidas is supplied with even more energy by Hagelschuer in its futuristic SPEEDFACTORY sports shoe factory in Ansbach. Oechsler, a company specializing in plastics processing, operates the SPEEDFACTORY, where sports shoes are produced using innovative processes. The heat required for […]

Textilpflege GmbH Auerbach

Hagelschuer Referenz Textilpflege Auerbach - Kesselanlage heben

Textilpflege GmbH Auerbach CASE STUDY: STEAM GENERATORS FOR LAUNDRY AND TEXTILE TECHNOLOGY STEAM PLANT IN THE BOILER HOUSE MADE OF PRE-CAST CONCRETE PARTS Hagelschuer added another important module to its range with the completely new pre-cast concrete heating system for Textilpflege GmbH Auerbach. In order to be able to meet the individual customer requirements in […]